Entered & Modified dates

Derivation formula for dates

I am busy redeveloping our large DataEase Dos data base to 7.2 and have a problem with the derivation the formula for dates.

In DOS I used the Current Date command to record a date on which the record was modified and ??/??/?? command to enter the date on which the record was first entered. This date never changed but the modified date should and did.

When I use the ??/??/?? command in the derivation field of the Field Defination input form as a date field it returns a ??/??/00 in the document view.

Am I doing something wrong or is there a way to fix this?

Wim

By: Wim von der Becke posted: 7th December 2009 - 09:19


Replies

Josef Vella at 9th December 2009 - 16:22 says:

Hi Wim

Try:  current extended date.  This should work (if i understood your problem correctly).

regards

Josef

 

 

 